Green Valley Trail 90% Plans Posted
MCC Meeting Sept 14, 2016
AGENDA for September 14, 2016, 7:00 PM at GCSD
504 Ave Alhambra, 3rd floor, El Granada
Trail Surfaces presentation — Pillar Pt Bluff Trail Improvement Project
Consent: Minutes for August 24, 2016
NOTE: Upcoming Candidate Forums
West Trail Erosion Protection Preferred Design Alternative
Pillar Point Harbor West Trail erosion protection design alternatives were considered by SMC Harbor Commissioners at their 9/7/2016 meeting. Despite their consultant’s (GHD) proposed preference of riprap (rock armoring), the Commissioners unanimously chose beach nourishment and shotcrete soil-nail wall which would be sculpted/colored to mimic on-site bedrock. Despite a higher initial cost, the Commissioners responded to public and CCC staff input for softer more natural aesthetic solutions. MCC letter & slide presentation – public comment on alternatives report

Nearby examples of sculpted/colored shotcrete are along Highway 1 at Devil’s Slide, and over Highway 92. Examples of shoreline installations are at Lands End in Pacifica and Pleasure Point in Santa Cruz.
Erosion caused the West Trail to be partially roped off from late 2011 to early 2016 when a partial emergency fix was constructed around a drainage culvert. Finalization of that emergency permit requires application to the Coastal Commission for a regular Coastal Development Permit for the 300-foot eroded segment of shoreline.
Assisted Mental Health Outpatient Treatment
Assisted Outpatient Treatment (AOT) is a county program that reaches out to people with a severe mental illness who are not connected to services and are challenged to live safely and stably in our community. The AOT team works to connect people to treatment to decrease mental health crises, hospitalizations, incarceration and homelessness while helping people achieve and maintain their physical and mental health. Learn more.